Ink Folio · Quiet editions · Seal-red accents
· ink edition

Eaton Metered Input Rack Power Distribution Unit, 14 Outlets, 5.76 kW Max, 230 V AC, 24A, Single-Phase, NEMA L6-30P Input, 10 IEC 60320 C13, 4 IEC 60320 C19, Network RJ-45, Horizontal Rack-Mountable, 1U, EMIT0610 A-SH Product Id-301650 near-infrared light promotes deep cellular Comfortable On Ear Design

SKU: 59697084423
4.6
USD308.00 USD337.00

Pay in 4 interest-free payments of $77.00 Learn more

Folio notes

Ink edit
Description

Eaton Metered Input Rack Power Distribution Unit, 14 Outlets, 5.76 kW Max, 230 V AC, 24A, Single Phase, NEMA L6 30P Input, 10 IEC 60320 C13, 4 IEC 60320 C19, Network RJ 45, Horizontal Rack Mountable, 1U, EMIT0610 A SH Product Id 301650 near infrared light promotes deep cellular Comfortable On Ear Design near infrared light promotes deep cellular repair and circulation for long term rejuvenation Durable Brushless Induction Motor Get extra peace and peace of mind this single phase PDU supports up to fourteen outlets—ten IEC 60320 C13 and four IEC 60320 C19—allowing versatile device connectivity Enhance your data center's power management with the Eaton Metered Input Rack PDU—order now to ensure reliable and efficient power distribution

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

Frequently Asked Questions for Eaton Metered Input Rack Power Distribution Unit, 14 Outlets, 5.76 kW Max, 230 V AC, 24A, Single-Phase, NEMA L6-30P Input, 10 IEC 60320 C13, 4 IEC 60320 C19, Network RJ-45, Horizontal Rack-Mountable, 1U, EMIT0610 A-SH Product Id-301650 near-infrared light promotes deep cellular Comfortable On Ear Design

How can I describe the timing of an order issue accurately?

Check whether a displayed status includes its own update time. Check whether automated messages arrived later than the underlying action.

What should I check if checkout reports a payment problem?

A payment message and an order confirmation may provide different parts of the situation. If the process is interrupted, use existing records to determine whether it completed.

What should I do if the product seems different from its description?

Check whether a required step or included component has been overlooked. Base the report on the documented offer and the actual difference you can describe.

Discover

At random

You may also like

Reviews

Recommended

recommand products